2012
DOI: 10.1016/j.compchemeng.2012.01.011
|View full text |Cite
|
Sign up to set email alerts
|

Real-time production scheduling in a multi-grade PET resin plant under demand uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…Optimization of production in bottle grade PET resin plant is target of model considered in this study. Some of the recent studies on bottle grade PET resin are given in Liberopoulos et al (2010) and in Hatzikonstantinou et al (2012). Production scheduling of a PET resin plant according to defined quality range is argued on these articles.…”
Section: Introductionmentioning
confidence: 99%
“…Optimization of production in bottle grade PET resin plant is target of model considered in this study. Some of the recent studies on bottle grade PET resin are given in Liberopoulos et al (2010) and in Hatzikonstantinou et al (2012). Production scheduling of a PET resin plant according to defined quality range is argued on these articles.…”
Section: Introductionmentioning
confidence: 99%
“…Another challenging issue is to investigate the ways of controlling a large number of uncertain parameters. Hence, scheduling under uncertainty has received a lot of attention in recent years (e.g., Hatzikonstantinou et al 2012;Vargas and Metters 2011;Torabi et al 2010;Verderame and Floudas 2009). Uncertainty can be derived from many aspects, such as demand or product orders, alternation or priority of orders, equipment failures, resource changes, and processing time variability.…”
Section: Literature Reviewmentioning
confidence: 99%