2009 IEEE International Frequency Control Symposium Joint With the 22nd European Frequency and Time Forum 2009
DOI: 10.1109/freq.2009.5168367
|View full text |Cite
|
Sign up to set email alerts
|

Real-time MTIE assessment with flexible control of computation process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2010
2010
2013
2013

Publication Types

Select...
4

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…The results of the experimental tests of the real-time MTIE computation using DSDR and EF methods with additional procedures were presented in [9,11]. Application of the modifications proposed -control of computation progress with threshold -has enabled effective protection against exceeding the limit.…”
Section: Real-time Methods Of Mtie Assessmentmentioning
confidence: 99%
See 2 more Smart Citations
“…The results of the experimental tests of the real-time MTIE computation using DSDR and EF methods with additional procedures were presented in [9,11]. Application of the modifications proposed -control of computation progress with threshold -has enabled effective protection against exceeding the limit.…”
Section: Real-time Methods Of Mtie Assessmentmentioning
confidence: 99%
“…In order to avoid these troublesome situations during the measurement and computation process performed in the real time, some procedures controlling the computation progress were introduced [9]. Using these procedures, the computation for a few longer observation intervals (belonging to the considered set of intervals) may be suspended in order to reduce the number of operations carried out within one sampling interval.…”
Section: Real-time Methods Of Mtie Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…Suspension of the analysis for particular observation interval can be performed in order to protect the measurement and computation process against exceeding the limit of the computation time (length of the sampling interval). Recently measured n max +1 time error samples (τ max =n max τ 0 is the longest observation interval considered) for each channel can be stored in the buffers in the memory in order to reduce the data access time, which is the crucial issue in the real-time computation [6,8]. Therefore all search operations will be performed using the data stored in the tables in the operational memory of the computer, which will reduce the computation time substantially.…”
Section: Real-time Computation Paradigm and Methodsmentioning
confidence: 99%
“…First solution is based on the time effective MTIE computation method with binary decomposition [4]. Second solution exploits the time effective extreme fix (EF) method [5] successfully applied earlier for single-channel real-time MTIE assessment [6,8,9]. In the paper the results of experimental tests of these methods are presented.…”
Section: Introductionmentioning
confidence: 98%