1999
DOI: 10.1109/61.772314
|View full text |Cite
|
Sign up to set email alerts
|

Real time digital power system simulator design considerations and relay performance evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2002
2002
2024
2024

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 34 publications
(7 citation statements)
references
References 12 publications
0
7
0
Order By: Relevance
“…eMEGASIM offers a direct platform compatible with ePHASORSIM, which procure maximum versatility from a large power grid simulation to highly detailed power electronic simulation. ePHASORSIM allows the simulation of massive grids going up to 20k buses on a single core computer and its capability to perform parallel computing allowing unleashed performances for lager realtime simulation [31], [32], [33], [34], [39]. The typical time step of these two systems is displayed by Fig.4.…”
Section: The Boundary Investigation Of Real-time Simulationmentioning
confidence: 99%
“…eMEGASIM offers a direct platform compatible with ePHASORSIM, which procure maximum versatility from a large power grid simulation to highly detailed power electronic simulation. ePHASORSIM allows the simulation of massive grids going up to 20k buses on a single core computer and its capability to perform parallel computing allowing unleashed performances for lager realtime simulation [31], [32], [33], [34], [39]. The typical time step of these two systems is displayed by Fig.4.…”
Section: The Boundary Investigation Of Real-time Simulationmentioning
confidence: 99%
“…S IMULATION has always been a mainstay at all stages of the development and operation of power systems-planning, design, prototyping, and testing [1]. Prior to the advent of digital computers, analog simulators, based on scaled-down models, were relied upon to emulate and predict the behavior of actual power systems.…”
Section: Introductionmentioning
confidence: 99%
“…A more attractive approach is to interface the actual digital controller with a real-time simulator. Real-time digital simulation of power systems is becoming increasingly popular for testing of new FACTS and HVDC controllers and protection systems [1,2]. The simulator provides real-time (on-line) simulation of the PEs and the host power system.…”
Section: Introductionmentioning
confidence: 99%