2012 IEEE 16th International Conference on Intelligent Engineering Systems (INES) 2012
DOI: 10.1109/ines.2012.6249872
|View full text |Cite
|
Sign up to set email alerts
|

Real time control system for industrial waste water management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2013
2013
2017
2017

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…To improve situation, online measuring equipment is sometimes applied purposing the load assessing to estimate the temporary fluid rate of the pipeline and to make decision of its use [12]. Nevertheless, they weakly affect the pumping management [13].…”
mentioning
confidence: 99%
“…To improve situation, online measuring equipment is sometimes applied purposing the load assessing to estimate the temporary fluid rate of the pipeline and to make decision of its use [12]. Nevertheless, they weakly affect the pumping management [13].…”
mentioning
confidence: 99%