2020
DOI: 10.1088/1757-899x/881/1/012119
|View full text |Cite
|
Sign up to set email alerts
|

Real measurement of optimal access point localizations

Abstract: The widely applied location-based services require a high standard for positioning technology. With the development of the wireless communication technology, the positioning services based on Wi-Fi are increasingly demanded. To understand the positioning accuracy limits under a certain given Access Point topology and to be able to make design recommendations. This paper proposed a method for proper deployment of AP devices on the building of the electrical department in the university of technology and computi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 9 publications
0
8
0
Order By: Relevance
“…The case study selected for our proposed algorithm is the 2nd and 3rd floor in the building of electrical department of University of Technology. It was designed and simulated using the WI software, as clarified in Figure 2 [24]. In addition, it has been distributed a total of three AP devices with 2.5 m height at each of the selected floors to perform the localization as a reference point.…”
Section: Case Studymentioning
confidence: 99%
“…The case study selected for our proposed algorithm is the 2nd and 3rd floor in the building of electrical department of University of Technology. It was designed and simulated using the WI software, as clarified in Figure 2 [24]. In addition, it has been distributed a total of three AP devices with 2.5 m height at each of the selected floors to perform the localization as a reference point.…”
Section: Case Studymentioning
confidence: 99%
“…The components are depicted in Figure 3. The purpose of the input module is to change the approach panels into signals, which can be prepared by the PLC, and transmit them to the focal control unit [19]. The reverse business is carried out through a performance module.…”
Section: B-s7-300 Plcmentioning
confidence: 99%
“…There are several facilities which perform the above functions and as shown below [16,17,18,19]: 1. Equipment of data collection.…”
Section: Scada Functional Unit and Configurationmentioning
confidence: 99%