2019 IEEE Nuclear Science Symposium and Medical Imaging Conference (NSS/MIC) 2019
DOI: 10.1109/nss/mic42101.2019.9059832
|View full text |Cite
|
Sign up to set email alerts
|

Readout board validation setup for the ALICE Time Of Flight detector upgrade

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…for validation and test of the DRM2 production (completed during 2019) is described in [65]. The installation of all DRM2 cards, partially delayed by the Covid-19 pandemic, was ended in June 2020 with full commissioning starting in September 2020.…”
Section: Jinst 19 P05062mentioning
confidence: 99%
“…for validation and test of the DRM2 production (completed during 2019) is described in [65]. The installation of all DRM2 cards, partially delayed by the Covid-19 pandemic, was ended in June 2020 with full commissioning starting in September 2020.…”
Section: Jinst 19 P05062mentioning
confidence: 99%