2021
DOI: 10.2749/ghent.2021.0070
|View full text |Cite
|
Sign up to set email alerts
|

Re-use of a 300 m steel arch bridge

Abstract: <p>The Van Brienenoordbrug consists of two steel tied arch bridges of 300m span, the east was built in 1965 and the west arch was built in 1990. They carry the A16 highway, a crucial part of the Dutch infrastructure network near the port of Rotterdam. The west arch has been suffering from fatigue in the orthotropic deck and Arup was assigned by Rijkswaterstaat (Dutch highway authority), to design a renovation for the west arch. The renovation required a solution for the orthotropic deck and strengthening… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…A strengthening and replacement strategy was developed to reduce closures to one of the two bridges at a time, minimizing the overall hindrance [1]. The construction sequence, planned for execution from 2026 -2029, involves building a new arch bridge to replace the newer of the two bridges and swapping them out.…”
Section: Introductionmentioning
confidence: 99%
“…A strengthening and replacement strategy was developed to reduce closures to one of the two bridges at a time, minimizing the overall hindrance [1]. The construction sequence, planned for execution from 2026 -2029, involves building a new arch bridge to replace the newer of the two bridges and swapping them out.…”
Section: Introductionmentioning
confidence: 99%