All Days 2006
DOI: 10.2118/103222-ms
|View full text |Cite
|
Sign up to set email alerts
|

Rate Allocation Using Permanent Downhole Pressures

Abstract: A common industry practice is to commingle production, either downhole or at the surface. Where multiple layers are present in a reservoir, the most economical development plans often involve commingling the production of all the layers. Commingling production is also cost effective in multiple well scenarios such as on a platform. In these situations, it is challenging to determine the individual flow rates from each layer or well. One operating practice is to isolate each layer or well and determine what fra… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2009
2009
2020
2020

Publication Types

Select...
3
2
2

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…During such evaluation, the well is tested at selected rates, which can be correlated to the choke-opening and the FTHP. Taking advantage of the dependence of flowrate on either choke 1 TVD = True Vertical Depth opening or/and FTHP, the resulting relationship would continue to be used for production allocation until individual wells can be tested again to re-calibrate the model (McCracken and Chorneyko, 2006;Hamad et al, 2004). This is the current practice in the asset under discussion.…”
Section: Uncertainties In Some Input Datamentioning
confidence: 99%
“…During such evaluation, the well is tested at selected rates, which can be correlated to the choke-opening and the FTHP. Taking advantage of the dependence of flowrate on either choke 1 TVD = True Vertical Depth opening or/and FTHP, the resulting relationship would continue to be used for production allocation until individual wells can be tested again to re-calibrate the model (McCracken and Chorneyko, 2006;Hamad et al, 2004). This is the current practice in the asset under discussion.…”
Section: Uncertainties In Some Input Datamentioning
confidence: 99%
“…Buildup interval identification (step 3) and the reconstruction of flow rate (step 4) tend to be a time consuming part of the workflow if processed manually, especially when the permanent gauge data is acquired over a long time. Methods for allocating flow rate to individual wells based on pressure measurements have been proposed by several authors [4][5][6] . The method for automatically detecting pressure buildup intervals is provided in some commercial software 7 .…”
Section: Introductionmentioning
confidence: 99%