R&D Status of Vacuum Components for the Upgrade of KEKB

Abstract: An upgrade plan of the KEK B-Factory (KEKB), Super KEKB (SKEKB) has been discussed in KEK. The R&D of main vacuum components for the SKEKB, such as beam ducts, bellows chambers and connection flanges etc., are now undergoing. Trial models of a beam duct with an antechamber and a bellows chamber with a comb-type RF shield were installed in the KEKB positron ring and tested with beam.Coatings with a low secondary electron yield were also investigated with the positron beam. A special connection flange with small… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
19
0

Publication Types

Select...
5
1

Relationship

4
2

Authors

Journals

citations
Cited by 7 publications
(21 citation statements)
references
References 3 publications
2
19
0
Order By: Relevance
“…The design of the beam pipes, of the bellows and of the gate valves for SuperKEKB has been done, and some prototypes were tested at present KEKB. There still remain a few R&D issues in beam collimators and coherent synchrotron radiation [1070][1071][1072][1073][1074][1075].…”
Section: Baseline Design Of Superkekbmentioning
confidence: 99%
“…The design of the beam pipes, of the bellows and of the gate valves for SuperKEKB has been done, and some prototypes were tested at present KEKB. There still remain a few R&D issues in beam collimators and coherent synchrotron radiation [1070][1071][1072][1073][1074][1075].…”
Section: Baseline Design Of Superkekbmentioning
confidence: 99%
“…The growth rates, ÿ1 [s ÿ1 ], of the longitudinal and transverse CBI were calculated with the formulas presented in Appendix C using the impedances obtained above. Here, the ÿ1 values for the cases of the present KEKB and the Super KEKB, an upgrade plan of KEKB [14,16,28], were evaluated. The main beam parameters (design values) of KEKB and Super KEKB related to the CBI are given in Table II.…”
Section: Growth Rate Of a Coupled Bunch Instabilitymentioning
confidence: 99%
“…For the clearing electrode, on the other hand, the effect of some tilt and/or incline of the electrode on the clearing property may be interesting. The simulation about the clearing electrode is now proceeding [30].…”
Section: Future Planmentioning
confidence: 99%