Quantity surveying and BIM 5D. Its implementation and analysis based on a case study approach in Spain

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 21 publications
(11 citation statements)
references
References 7 publications
0
11
0
Order By: Relevance
“…Lack of skilled personnel is also a recurring cause (Chien et al, 2014;Zaia et al, 2022;Pakhale & Pal, 2020;Vass & Gustavsson, 2017;Saka et al, 2022;Ai Lin Teo, 2018), which also explains the difficulty in workflow transition (Chien et al 2014;Pakhale & Pal, 2020) and the lack of attitude, willingness, and interest in using BIM associated with a resistance to change (Xu et al 2014;Baldrich Aragó et al, 2021;Valdepeñas et al, 2020).…”
Section: Peoplementioning
confidence: 99%
See 1 more Smart Citation
“…Lack of skilled personnel is also a recurring cause (Chien et al, 2014;Zaia et al, 2022;Pakhale & Pal, 2020;Vass & Gustavsson, 2017;Saka et al, 2022;Ai Lin Teo, 2018), which also explains the difficulty in workflow transition (Chien et al 2014;Pakhale & Pal, 2020) and the lack of attitude, willingness, and interest in using BIM associated with a resistance to change (Xu et al 2014;Baldrich Aragó et al, 2021;Valdepeñas et al, 2020).…”
Section: Peoplementioning
confidence: 99%
“…Other relevant factors intrinsically linked to the people dimension are the modelers' lack of field experience, as well as the low rate of BIM software training, and the low or insipient culture of information sharing, being these causes the most cited and recurrent in the selected studies (Xu et al 2014;Belyakov et al 2020, Baldrich Aragó et al, 2021Abd Shukor et al, 2021;Liao & Ai Lin Teo, 2018;Ciribini et al, 2016;Nical & Wodynski, 2016;Delgado et al, 2019;Borges Viana & Marques Carvalho, 2021;Gurevich & Sacks, 2020;Baharuddin et al, 2020;Jensen & Jóhan-Nesson, 2013;Saka et al, 2022;Beach et al, 2017).…”
Section: Peoplementioning
confidence: 99%
“…BIM 4D integrates BIM 3D with the time dimension, so BIM 4D can simulate the green building construction process to support the schedule development and revision, constructability analysis, clash detection, and other functions [117][118][119][120][121][122]. BIM 5D is based on BIM 4D, with the addition of cost-related information [123,124]. Through BIM 5D, the construction organizations can effectively forecast and account for the expenditure of the green building construction project at different phases, and predict the return-on-investment (ROI) ratio [125][126][127][128].…”
Section: Planning and Schedule Management Optimizationmentioning
confidence: 99%
“…Based on the abovementioned information, the logistics and transportation routes can also be automatically formulated through BIM [158][159][160][161][162]. Finally, through the information mentioned above, the estimated cost and budgets can be put forward by BIM [123,124,151].…”
Section: Bim Capabilities In the Green Building Pre-construction Phasementioning