2022
DOI: 10.1061/(asce)co.1943-7862.0002317
|View full text |Cite
|
Sign up to set email alerts
|

Quality Control for Offsite Construction: Review and Future Directions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(6 citation statements)
references
References 80 publications
0
2
0
Order By: Relevance
“…This study adopted a holistic and broad bibliometric approach, exploring the field of PCRs by combining metrological analysis with content analysis. The bibliometric approach, which is extensively regarded as more reliable and impartial compared to alternative techniques [61], can provide important understanding into the features and structure of a certain domain in a systematic, transparent, and reproducible procedure [64,65]. This study uses a methodology similar to that of Pollack and Adler's [68] study which examines trends in project management in a broad context.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…This study adopted a holistic and broad bibliometric approach, exploring the field of PCRs by combining metrological analysis with content analysis. The bibliometric approach, which is extensively regarded as more reliable and impartial compared to alternative techniques [61], can provide important understanding into the features and structure of a certain domain in a systematic, transparent, and reproducible procedure [64,65]. This study uses a methodology similar to that of Pollack and Adler's [68] study which examines trends in project management in a broad context.…”
Section: Methodsmentioning
confidence: 99%
“…[63] overviewed 152 PC supply chain management articles from 2001 to 2018 through bibliometric and thematic analysis. Liu et al [64] carried out a bibliometric analysis and cluster analysis to highlight PCRs related to quality control using VosViewer, focusing on PC-related publications from the past 20 years, and identified research gaps and future directions.…”
Section: Existing Studies On Pcmentioning
confidence: 99%
“…Os pesquisadores citam como obstáculos para a construção modular: problemas de coordenação da mão de obra (GOH; GOH, 2019; INNELLA; ARASHPOUR; BAI, 2019), tempos elevados de armazenamento (GOH; GOH, 2019), problemas de tolerância e desalinhamento geométrico (ENSHASSI et al, 2019), políticas e diretrizes para OSC não padronizadas (JANG; LEE; SON, 2022), conhecimento insuficiente acerca da abordagem (KAMER et al, 2009 apud ELDAMNHOURY;HANNA, 2020), alto custo inicial, restrições de transportes (KAZEM-ZADEH; ISSA, 2020), problemas na cadeia de suprimento (ELDAMNHOURY; HANNA, 2020), controle de qualidade ineficiente (LIU et al, 2022;SHIN;CHOI, 2022), montagem complexa e comunicação deficiente entre as partes interessadas (RAZKENARI et al, 2020;LUO et al, 2020), entre outros.…”
Section: Gestão De Custos Planejamento E Processos Produtivos Na Cons...unclassified
“…In addition, proper assembly in situ should be ensured to avoid delays due to reworking or replacement of modules. On the one hand, this should be ensured by high standards of quality assurance in production [21,22], e.g., by suited measurement techniques [23][24][25] of the components. On the other hand, if the tolerance requirements of the components are too high, tolerance-compensating placement strategies can be exploited.…”
Section: Introductionmentioning
confidence: 99%