2008
DOI: 10.2172/934408
|View full text |Cite
|
Sign up to set email alerts
|

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows

Abstract: ph: (865) 576-8401 fax: (865) 576-5728 email: reports@adonis.osti.gov Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161 ph: (800) 553-6847 fax: (703) 605-6900 email: orders@ntis.fedworld.gov online ordering: http://www.ntis.gov/ordering.htm This document was printed on recycled paper. Testing Summary The U.S. Department of Energy (DOE) Office of River Protection's Waste Treatment Plant (WTP) is being designed and bui… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The controller tests were performed using the four PJM test stand available in PNNL's 336 Building test facility. A detailed description of the existing test equipment and configuration is presented in Bontha et al (2003) and Pfund et al (2008), and a brief summary is presented in this section.…”
Section: Equipment Descriptionmentioning
confidence: 99%
“…The controller tests were performed using the four PJM test stand available in PNNL's 336 Building test facility. A detailed description of the existing test equipment and configuration is presented in Bontha et al (2003) and Pfund et al (2008), and a brief summary is presented in this section.…”
Section: Equipment Descriptionmentioning
confidence: 99%