2017 70th Annual Conference for Protective Relay Engineers (CPRE) 2017
DOI: 10.1109/cpre.2017.8090045
|View full text |Cite
|
Sign up to set email alerts
|

Protection challenges for North America's first combined cable/overhead double-circuit 500 kV transmission line with mutual coupling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 9 publications
0
1
0
Order By: Relevance
“…Also, as mentioned in the NERC report [6], the shunt compensation is modeled at one end of the underground cable. More details are collected from [34]. • Two current transformers are connected on the fault line, to measure the remote and local end currents.…”
Section: Emt Model Development and Simulation (A) Emt Model Developme...mentioning
confidence: 99%
“…Also, as mentioned in the NERC report [6], the shunt compensation is modeled at one end of the underground cable. More details are collected from [34]. • Two current transformers are connected on the fault line, to measure the remote and local end currents.…”
Section: Emt Model Development and Simulation (A) Emt Model Developme...mentioning
confidence: 99%
“…Then, it is connected to a 8 miles of a single circuit overhead line with 500 kV line. This complex configuration is subjected to varieties of technical challenges regarding their protection system as described by Bucco et al (2017). Another example is the 400 kV inter-tie Egypt-Jordan integration with both single and double circuit segments (Zahran et al, 2017).…”
Section: Introductionmentioning