2018
DOI: 10.3311/ppme.11877
|View full text |Cite
|
Sign up to set email alerts
|

Prospects of Using Hydrodynamic Cavitation for Enhancement of Efficiency of Fluid Working Medium Preparation Technologies

Abstract: In this article a hardware estimation procedure and optimization of parameters of working fluid cavitation processing are proposed. Here the basic aspects of preparation efficiency and using of water-fuel emulsion are reviewed. An example of estimation of energy parameters of hydrodynamic activator operation in obtaining water-fuel emulsion is supplied.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
3

Relationship

3
5

Authors

Journals

citations
Cited by 28 publications
(12 citation statements)
references
References 5 publications
0
12
0
Order By: Relevance
“…Design variables were defined according to the formulas, which consider energy expenditures in the working zone and results of preceding researches [11].…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Design variables were defined according to the formulas, which consider energy expenditures in the working zone and results of preceding researches [11].…”
Section: Methodsmentioning
confidence: 99%
“…In our research the information, received only from the experimental researches was used. It was enough for the practical realization of offered methodology [11].…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Heating by using the microwave energy has some positive side effects. Thus, the effect of reducing the surface tension coefficient of water [6][7][8][9] accelerates evaporation [10].…”
Section: Introductionmentioning
confidence: 99%
“…Developing the design for this type of equipment is the most important direction to improve the energy efficiency of industrial production. The way of increasing the efficiency of parts manufacturing, production planning stage and fixture design is an urgent task [1][2][3].…”
Section: Introductionmentioning
confidence: 99%