Project scheduling and material ordering problem with storage space constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0
1

Year Published

2022
2022
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(9 citation statements)
references
References 24 publications
0
8
0
1
Order By: Relevance
“…Due to its versatility and usability, the NSGA-II has become one of the standard approaches to solving various scheduling problems in the construction industry, which has been tested in different studies [16]. Some of the recent models in the construction scheduling which have been solved by NSGA-II focus on optimizing other important aspects along with the project makespan minimization, such as material procurement [17,18], crew planning [19], project prioritization [20], location and workspace congestion [21], as well as project financing [22]. Due to metaheuristics' efficiency in similar construction scheduling problems, we decided to apply the NSGA-II algorithm from the open-source framework pymoo [23] that allows customization of the algorithm to the user needs.…”
Section: Resilient Scheduling Frameworkmentioning
confidence: 99%
See 1 more Smart Citation
“…Due to its versatility and usability, the NSGA-II has become one of the standard approaches to solving various scheduling problems in the construction industry, which has been tested in different studies [16]. Some of the recent models in the construction scheduling which have been solved by NSGA-II focus on optimizing other important aspects along with the project makespan minimization, such as material procurement [17,18], crew planning [19], project prioritization [20], location and workspace congestion [21], as well as project financing [22]. Due to metaheuristics' efficiency in similar construction scheduling problems, we decided to apply the NSGA-II algorithm from the open-source framework pymoo [23] that allows customization of the algorithm to the user needs.…”
Section: Resilient Scheduling Frameworkmentioning
confidence: 99%
“…Designs 2022, 6, x FOR PEER REVIEW 4 of 19 [17,18], crew planning [19], project prioritization [20], location and workspace congestion [21], as well as project financing [22]. Due to metaheuristics' efficiency in similar construction scheduling problems, we decided to apply the NSGA-II algorithm from the opensource framework pymoo [23] that allows customization of the algorithm to the user needs.…”
Section: Resilient Scheduling Frameworkmentioning
confidence: 99%
“…Different accidents require different types and quantities of materials, and scholars proposed emergency material scheduling schemes based on logistics models. For example, Zhang et al [6] proposed material scheduling when oil spill accidents occurred in petrochemical enterprises; Zhang and Cui [7] proposed material scheduling model in limited space. However, the material dispatch scheme only is considered in special circumstances, and ignores the situation dominated by fire and poisoning accidents.…”
Section: Introductionmentioning
confidence: 99%
“…They proposed a multi-objective mathematical model to determine scheduling and ordering decisions so that the total cost and environmental and social impacts were minimized. To face uncertainties in activity durations and their detrimental effects on the inventory system, Zhang and Cui ( 2021 ) presented a two-stage optimization model to obtain robust solutions. Their first stage determined a basic schedule to minimize the total cost, and then, the proactive decisions related to the project schedule and material ordering were made in the second stage.…”
Section: Introductionmentioning
confidence: 99%