2013
DOI: 10.5121/ijcsit.2013.5503
|View full text |Cite
|
Sign up to set email alerts
|

Project Monitoring and Control Measures In CMMI

Abstract: Project monitoring and control process is an important process in developing any computer information system. Monitoring and Control provides an understanding of the project's progress so that when the project deviates significantly from the plan appropriate corrective actions can be taken. This research will identify general measures for the specific goals and its specific practices of Project Monitoring and Control Process Area in Capability Maturity Model Integration (CMMI). CMMI is developed in USA by Soft… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
3
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 24 publications
0
3
0
Order By: Relevance
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Various researches aimed to measure the software process that has been suggested, such as [21,[31][32][33][34][35][36][37][38][39][40][41]. The works that are related the most to our work are represented in the works of [21,31,32,[35][36][37][38][39][40][41]. Baumertand McWhinney [42] point out to several observations that are usefulfor measuring the practices (general characteristics) that are defined in the Capability Maturity Model for CMM/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
“…Loconsole [13] (CMM/SW), rather than (CMMI/SW). Khraiwesh, [31,[35][36][37][38][39]41] identifies a set of measures for processessuch as validation, process and product quality assurance, risk management, project planning, project monitoring and control, and configuration management in CMMI/SW.…”
Section: The Relevant Workmentioning
confidence: 99%
“…Many software measures researches have been suggested in the literature, some of them are[5] [14] [17] [21] [22] [23] [24] [28] [32]. The most related to our work are [5] [28] [32] [21] [22] [23] and[24]. The study of Baumert and McWhinney[5] defines a set of indicators that are convenient with the measurement practice (a common features) described in the Capability Maturity Model for CMM/SW.…”
mentioning
confidence: 99%