2012
DOI: 10.1016/j.fusengdes.2011.11.014
|View full text |Cite
|
Sign up to set email alerts
|

Project management techniques used in the European Vacuum Vessel sectors procurement for ITER

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2012
2012

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…This paper describes the main activities carried out during the first stage of the contract which includes the development of the manufacturing route, engineering analysis, manufacturing conceptual and detail design, mock-ups, welding and NDT qualifications. A parallel paper at this conference describes the management of the procurement [1]. The VV safety is assured by the RCC-MR code, originally written for French fast reactors, which includes an appendix devoted to ITER VV.…”
Section: Introductionmentioning
confidence: 99%
“…This paper describes the main activities carried out during the first stage of the contract which includes the development of the manufacturing route, engineering analysis, manufacturing conceptual and detail design, mock-ups, welding and NDT qualifications. A parallel paper at this conference describes the management of the procurement [1]. The VV safety is assured by the RCC-MR code, originally written for French fast reactors, which includes an appendix devoted to ITER VV.…”
Section: Introductionmentioning
confidence: 99%