2016
DOI: 10.3390/en9121060
|View full text |Cite
|
Sign up to set email alerts
|

Project Management for a Wind Turbine Construction by Applying Fuzzy Multiple Objective Linear Programming Models

Abstract: Abstract:Meeting the demand of energy is a challenge for many countries these days, and generating electricity from renewable resources has become a main trend for future economic development. The construction of a renewable energy plant is costly and timely; therefore, a good project management model is essential. In this paper, a fuzzy multiple objective linear programming (FMOLP) model is constructed based on program evaluation and review technique (PERT) first. With the consideration of the different degre… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 31 publications
(37 reference statements)
0
4
0
Order By: Relevance
“…The FMOLP model is a top‐down model, which can be used to study constraints and multi‐objective functions and meets the uncertainty requirements of LUCC planning problems. The model has been extensively applied in various fields with excellent results (Huang & Huang, 2016; Kang et al, 2016). Nevertheless, the clearest deficiency of the GM‐FMOLP model is that it cannot simulate the results of individual spatial interactions on LUCC.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The FMOLP model is a top‐down model, which can be used to study constraints and multi‐objective functions and meets the uncertainty requirements of LUCC planning problems. The model has been extensively applied in various fields with excellent results (Huang & Huang, 2016; Kang et al, 2016). Nevertheless, the clearest deficiency of the GM‐FMOLP model is that it cannot simulate the results of individual spatial interactions on LUCC.…”
Section: Introductionmentioning
confidence: 99%
“…The FMOLP model is a topdown model, which can be used to study constraints and multiobjective functions and meets the uncertainty requirements of LUCC planning problems. The model has been extensively applied in various fields with excellent results Kang et al, 2016).…”
mentioning
confidence: 99%
“…Zhao and Guo [8] used the Analytic Hierarchy Process (AHP) and the fuzzy synthetic evaluation method to carry out the risk assessment of the Zhejiang-Fuzhou EHV distribution networking project. In Kang's research [9], the fuzzy multiple objective linear programming (FMOLP) model was constructed to provide references for the management of project and then, a wind turbine construction project in Taiwan was employed for empirical analysis to validate the model established in this paper. Fu [10] applied the expert scoring method to identify the risk factors in the construction process of power grid projects on the basis of life cycle theory.…”
Section: Introductionmentioning
confidence: 99%
“…Researchers in [68] utilized FMOLP model to construct a renewable energy plant. This model offers a concession result to maximize the total degree of satisfaction of the multi-objective project.…”
mentioning
confidence: 99%