2019
DOI: 10.1088/1741-4326/ab0f84
|View full text |Cite
|
Sign up to set email alerts
|

Progress toward ITER’s First Plasma

Abstract: ITER reached 50% completion of the work required to achieve First Plasma in November 2017. Progress has been made on ITER infrastructure since the 2016 FEC, most visibly the construction of many key buildings. The key parts of the tokamak assembly building and the tokamak bioshield have been completed. The tokamak building itself will be ready for equipment in 2020. The cryogenic plant and the magnet power supply buildings are complete, and these systems begin commissioning in 2019. The power conversion and di… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
51
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 73 publications
(52 citation statements)
references
References 16 publications
(21 reference statements)
0
51
0
1
Order By: Relevance
“…where B ϕ0 , n 0 , T 0 are given as B ϕ0 = 0.1 T, n 0 = 10 19 m −3 and T 0 = 10 6 K, respectively. In the present numerical experiment, the artificial data m 1 , m 2 , • • • , m 6 are obtained by giving the value of p true as [4,3,3,5,4,3] t . We apply the reconstruction algorithm with starting from some different initial guesses.…”
Section: Methods Of Equilibrium Reconstruction For Rfpmentioning
confidence: 99%
See 3 more Smart Citations
“…where B ϕ0 , n 0 , T 0 are given as B ϕ0 = 0.1 T, n 0 = 10 19 m −3 and T 0 = 10 6 K, respectively. In the present numerical experiment, the artificial data m 1 , m 2 , • • • , m 6 are obtained by giving the value of p true as [4,3,3,5,4,3] t . We apply the reconstruction algorithm with starting from some different initial guesses.…”
Section: Methods Of Equilibrium Reconstruction For Rfpmentioning
confidence: 99%
“…Aiming at dealing not only with axisymmetric toroidal plasmas but also with non-axisymmetric toroidal plasmas and to plasmas described by some future perspective model, we formulate the problems of equilibrium reconstruction in generalized forms. We consider a system described by the following partial differential equation in the three dimensional space R 3 .…”
Section: Problem Formulation Of Equilibrium Reconstruction As Data Assimilationmentioning
confidence: 99%
See 2 more Smart Citations
“…This way the NBTF will provide several years of experience with the source and the whole injector before the start of ITER NBI and will accompany the ITER NBI operation so as to solve possible injector issues 2 . So the NBTF schedule is tightly linked with the overall ITER staged approach 8 , which assumes both ITER NBIs to be installed by September 2031. To fulfil such a plan, SPIDER is required to provide most of the relevant information when MITICA will start beam operation (spring 2023), whereas the experience gained with SPIDER and MITICA will have to confirm the design of the beam source of ITER NBIs, whose construction is planned to start by mid-2027.…”
Section: Introductionmentioning
confidence: 99%