2014
DOI: 10.1109/tasc.2013.2294959
|View full text |Cite
|
Sign up to set email alerts
|

Progress of ITER TF Coil Development in Japan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…To achieve these targets, a welding procedure that combines a laser and arc welding was established via trials in RP segment and sector assembly. A machining process was also established as well [9]. Consequently, all 63 RPs were manufactured as per the flatness, profile, and groovelength scatter requirements shown in Figs.…”
Section: Radial Plate Fabrication and Cover Plate Weldingmentioning
confidence: 99%
“…To achieve these targets, a welding procedure that combines a laser and arc welding was established via trials in RP segment and sector assembly. A machining process was also established as well [9]. Consequently, all 63 RPs were manufactured as per the flatness, profile, and groovelength scatter requirements shown in Figs.…”
Section: Radial Plate Fabrication and Cover Plate Weldingmentioning
confidence: 99%
“…Following this, new RP manufacturing procedures were proposed by EUDA, full final machining of RP grooves [7] by JADA, final assembly of RP sub-sections with extra length [8] to accommodate the ±0.05% error between the RP grooves and the heat-treated conductor lengths.…”
Section: Development Of Iter Tf Coils In Japanmentioning
confidence: 99%