2007 IEEE International Conference on Signal Processing and Communications 2007
DOI: 10.1109/icspc.2007.4728447
|View full text |Cite
|
Sign up to set email alerts
|

Programmable Signal Generator based on Advanced Tricore Microcontrollers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…The results of the analysis show that in order to ensure the safety of train traffic, the locomotive driver needs to reduce the speed of the train, which, in turn, will lead to train delays and disruption of their schedules. While ensuring the continuity of the ALS system, carrying out work on its monitoring and diagnostics, it helps to reduce the number of failures and errors in the system, as well as improve train safety and reduce the number of delays [11,12].…”
Section: Methodsmentioning
confidence: 99%
“…The results of the analysis show that in order to ensure the safety of train traffic, the locomotive driver needs to reduce the speed of the train, which, in turn, will lead to train delays and disruption of their schedules. While ensuring the continuity of the ALS system, carrying out work on its monitoring and diagnostics, it helps to reduce the number of failures and errors in the system, as well as improve train safety and reduce the number of delays [11,12].…”
Section: Methodsmentioning
confidence: 99%