2015
DOI: 10.5120/20522-2633
|View full text |Cite
|
Sign up to set email alerts
|

Profit Analysis of a Two-Unit Cold Standby System with Delayed Repair of Partially Failed Unit and Better Utilization of Units

Abstract: The paper presents the profit analysis of a two unit cold standby system with delayed repair of partially failed unit and better utilization of units. It is assumed that the system stops functioning only when both the units fail. The failure time distributions and delayed time distribution of each unit are assumed to be negative exponential with different parameters whereas the repair time distributions are taken to general. Formulas for various reliability indices of the system including availability, busy pe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 8 publications
(5 reference statements)
0
3
0
Order By: Relevance
“…There has been a lot of work on systems with one main unit and one dissimilar unit added in parallel including Kumar & Sirohi [2015] and Singh & Poonia [2019]. There are some studies conducted on systems with three or more units including El-Damcese and Temraz [2012], Lado and Singh [2019], Singh et al [2020], Gehlot et al [2020] but in these studies all the units taken are identical.…”
Section: Introductionmentioning
confidence: 99%
“…There has been a lot of work on systems with one main unit and one dissimilar unit added in parallel including Kumar & Sirohi [2015] and Singh & Poonia [2019]. There are some studies conducted on systems with three or more units including El-Damcese and Temraz [2012], Lado and Singh [2019], Singh et al [2020], Gehlot et al [2020] but in these studies all the units taken are identical.…”
Section: Introductionmentioning
confidence: 99%
“…Kumar and Sirohi [26] studied a k-out-of-n: G type of system with repair and without repair using the linear differential equation and regenerative point technique. Kumar and Sirohi [27] conferred on the reliability evaluation of a system having two units cold standby system for the delay in repairing the partially failed unit was truckled under regenerative point technique. Singh and Poonia [28] analyzed two units in a parallel configuration with correlated lifetime under inspection and regenerative point technique.…”
Section: Introductionmentioning
confidence: 99%
“…Yusuf. I [28], Kumar [29,30] and Barak [31] have studied the reliability characteristics of complex systems consisting of the main unit with supporting unit and repair facility.…”
Section: Introductionmentioning
confidence: 99%