2018
DOI: 10.1007/s42044-018-0011-8
|View full text |Cite
|
Sign up to set email alerts
|

Profit analysis of a computer system with preventive maintenance and priority subject to maximum operation and repair times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…Kumar and Saini (2018a) analyzed the availability of marine power plant using the fuzzy method. Kumar and Saini (2018b) discuss the impact of preventive maintenance and repair priority on the profit of a computer system. Kumar et al (2018) presented stochastic modelling of a non-identical system following Weibull distribution with priority and preventive maintenance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Kumar and Saini (2018a) analyzed the availability of marine power plant using the fuzzy method. Kumar and Saini (2018b) discuss the impact of preventive maintenance and repair priority on the profit of a computer system. Kumar et al (2018) presented stochastic modelling of a non-identical system following Weibull distribution with priority and preventive maintenance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Dhankhar (2011), Dhankhar et al (2012), Bhardwaj and Singh (2015); Nandal and Rathee (2015) have considered the idea of failure of service facility (called server) while studying stochastic models of repairable systems. Further, Kumar and Saini (2018) have also studied computer systems with cold standby redundancy for the entire system by adopting different repair policies. However, the concept of failure of service facility has not been much introduced in the stochastic modeling of computer systems with unit wise redundancy in cold standby.…”
Section: Introductionmentioning
confidence: 99%