Day 1 Tue, March 23, 2021 2021
DOI: 10.2523/iptc-21468-ms
|View full text |Cite
|
Sign up to set email alerts
|

Production Tubing Leak Repair Using Reinforced Thermoplastic Pipe

Abstract: Operators are faced with never-ending well integrity issues relating to tubing leaks. This situation is particularly important in oil and gas wells that are producing in corrosive environments. When a well can no longer be safely produced due to well integrity issues relating to tubing leaks, an expensive workover is often performed to restore the tubing integrity. To improve the economics of a well intervention involving tubing leak repairs, a new cost-effective method is being proposed. The novel technology … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…In prior studies, this scale was used. Since BIM-based safety and risk management is still relatively new in Malaysia, the sampling process for the relevant subpopulation was considered [57,58].…”
Section: Data Collectionmentioning
confidence: 99%
See 1 more Smart Citation
“…In prior studies, this scale was used. Since BIM-based safety and risk management is still relatively new in Malaysia, the sampling process for the relevant subpopulation was considered [57,58].…”
Section: Data Collectionmentioning
confidence: 99%
“…With moderate to high scores, the other constructs-creativity barriers, knowledge barriers, and technical barriers-show their significance to the BIM adoption process. Nonetheless, their performance ratings are mediocre, suggesting that more work is required to overcome these challenges [44,58]. This table may help the company solve the many challenges to BIM deployment by prioritizing the constructs with higher relevance ratings and lower performance scores.…”
Section: Path Analysismentioning
confidence: 99%
“…Related successful cases have been reported in many areas. [18][19][20] However, it is crucial for the successful assessment and rigless leakage repiar to know the leakage type and depth. Otherwise, the risk assessment accuracy and leakage repair performance maybe fail to the expectation.…”
Section: Introductionmentioning
confidence: 99%
“…Diffrient from workover, quantitative risk assessment, 14,15 and rigless leakage repair 16,17 can overcome the disadvantages of workover. Related successful cases have been reported in many areas 18–20 . However, it is crucial for the successful assessment and rigless leakage repiar to know the leakage type and depth.…”
Section: Introductionmentioning
confidence: 99%