Production scheduling problem in a factory of automobile component primer painting

Abstract: In a factory of automobile component primer painting, various automobile parts are attached to overhead hangers in a conveyor line and undergo a series of coating processes. Thereafter, the components are wrapped at a packaging station. The packaging process should be fully balanced by an appropriate sequence of components to prevent the bottleneck effect because each component requires different packaging times and materials. An overhead hanger has a capacity limit and can hold varying numbers of components d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
9

Relationship

2
7

Authors

Journals

citations
Cited by 12 publications
(11 citation statements)
references
References 51 publications
(43 reference statements)
0
8
0
Order By: Relevance
“…We solved our proposed models using the CPLEX 12.9 commercial solver that has been used in many previous studies [51][52][53], including the ones that provided solutions for real company problems. Our codes are written in Python language with Python 3.7 version in the Microsoft Visual Studio Community Edition 2019 platform.…”
Section: Resultsmentioning
confidence: 99%
“…We solved our proposed models using the CPLEX 12.9 commercial solver that has been used in many previous studies [51][52][53], including the ones that provided solutions for real company problems. Our codes are written in Python language with Python 3.7 version in the Microsoft Visual Studio Community Edition 2019 platform.…”
Section: Resultsmentioning
confidence: 99%
“…In order to meet the above constraint (8), the other topcoat j 2 = j 1 on the (k + 1)-th skid cannot be arranged, and the expression 2 is equal to 0. Inequality (9) demonstrates that one empty skid can often be placed between two consecutive painting tasks.…”
Section: Color Change Restrictionsmentioning
confidence: 99%
“…A capacity limitation and a type restriction of overhead hangers were considered in reference [9]. A mixed-integer programming model for the scheduling problem was developed.…”
Section: Introductionmentioning
confidence: 99%
“…painting, polishing or flaming. Commonly, in these industrial applications, human craftsmanship needs to be precisely imitated and the available commercial robot programming solutions, based on highly advanced teach pendants and simulation software, fall short to deliver, affecting the large-scale adoption of industrial robots in many industrial sectors (Ghahramani et al, 2019;Singgih et al, 2020).…”
Section: Introductionmentioning
confidence: 99%