2018
DOI: 10.1016/j.cie.2018.09.048
|View full text |Cite
|
Sign up to set email alerts
|

Production scheduling and nesting in additive manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
44
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 112 publications
(45 citation statements)
references
References 15 publications
0
44
0
1
Order By: Relevance
“…The planning problem for a case in which orders from different distributed customers were satisfied by due dates was studied by Chergui et al (2018). A mathematical formulation of the problem was presented and a heuristic was also proposed to solve it.…”
Section: Production Scheduling and Nesting Problemsmentioning
confidence: 99%
See 1 more Smart Citation
“…The planning problem for a case in which orders from different distributed customers were satisfied by due dates was studied by Chergui et al (2018). A mathematical formulation of the problem was presented and a heuristic was also proposed to solve it.…”
Section: Production Scheduling and Nesting Problemsmentioning
confidence: 99%
“…Moving on to powder-bed laser processes (e.g. Selective Laser Sintering, Selective Laser Melting, Direct Metal Laser Sintering), Chergui et al (2018) presented a model that considered delivery times in which the utilization of the manufacturing area was subordinated to the on-time service of the parts produced.…”
Section: Nesting Problem Approachmentioning
confidence: 99%
“…Inspired by our research, several studies have been reported recently. The production planning and scheduling of identical parallel AM machines to fulfil the different orders by due dates and to minimize the total tardiness was studied by Akram et al [40], where the mathematical formulation of the problem and a heuristic procedure were proposed. The problem was formulated as two subproblems-part/job assignment through part clustering based on due dates and job scheduling based on tardiness of the jobs.…”
Section: Related Workmentioning
confidence: 99%
“…Such links in the timetable shall be included in the area of production planning. They consist in manufacturing a given element on several machines in a process line [5,19]. This chain is more flexible (easy to reorganise) and there are no such restrictions as in rail transport.…”
Section: Dependent Operationsmentioning
confidence: 99%
“…Tego typu powiązania w harmonogramie uwzględnia się w obszarze planowania produkcji. Polegają one na wytwarzaniu danego elementu na kilku maszynach w ciągu technologicznym [5,19]. Łańcuch ten cechuje się większą elastycznością (łatwością reorganizacji) i nie występują tam takie ograniczenia jak w transporcie kolejowym.…”
Section: Działania Zależneunclassified