1999
DOI: 10.1016/s0925-5273(98)00104-2
|View full text |Cite
|
Sign up to set email alerts
|

Production planning using a hybrid simulation – analytical approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
72
0
1

Year Published

2006
2006
2017
2017

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 143 publications
(75 citation statements)
references
References 4 publications
0
72
0
1
Order By: Relevance
“…Their simple form permits direct inclusion in the LP model. In iterative approaches (Hung and Leachman 1996;Byrne and Bakir 1999;Hung and Hou 2001;Kim and Kim 2001;Riano 2002), the LP model is solved several times where each time the variables that specify the PU behavior are updated. These updated values are obtained from a separate, descriptive PU model.…”
Section: Literaturementioning
confidence: 99%
See 1 more Smart Citation
“…Their simple form permits direct inclusion in the LP model. In iterative approaches (Hung and Leachman 1996;Byrne and Bakir 1999;Hung and Hou 2001;Kim and Kim 2001;Riano 2002), the LP model is solved several times where each time the variables that specify the PU behavior are updated. These updated values are obtained from a separate, descriptive PU model.…”
Section: Literaturementioning
confidence: 99%
“…These updated values are obtained from a separate, descriptive PU model. In Hung and Leachman (1996), Byrne and Bakir (1999) and Kim and Kim (2001), this model is a simulation model and in Hung and Hou (2001) and Riano (2002) this model is the M/M/1 queueing model.…”
Section: Literaturementioning
confidence: 99%
“…This iteration is repeated until convergence. Other models based on the idea of iterating between optimisation and simulation models have been proposed by Byrne and Bakir (1999), Byrne and Hossain (2005), Riaño (2003) and Kim and Kim (2001). However, the convergence of these methods is not well understood and may depend on the structure of the underlying production system (Irdem et al, 2010).…”
Section: Approaches Assuming Deterministic Demandmentioning
confidence: 99%
“…Yong Hae Lee and Sool Han Kim [21] propose a hybrid approach combining the analytic and simulation model for production-distribution planning in supply chain, considering capacity constraints. Byrne and Bakir [22] study a hybrid algorithm combining mathematical programming and simulation models of manufacturing system for the multi-period and multi-product production planning problem. They suggest the usefulness of a hybrid method showing the solution from the analytic model cannot de acceptable in real world.…”
Section: Hybrid Modelsmentioning
confidence: 99%
“…They suggest the usefulness of a hybrid method showing the solution from the analytic model cannot de acceptable in real world. Kim and Kim [23] extend the idea of Byrne and Bakir [22] to find the capacityfeasible production plan using the analytic and the simulation model. They propose a methodology to properly modify both the left-hand and the right-hand sides of the capacity constraints in the analytic model, using the results of the simulation model.…”
Section: Hybrid Modelsmentioning
confidence: 99%