Day 3 Thu, December 08, 2016 2016
DOI: 10.2118/184131-ms
|View full text |Cite
|
Sign up to set email alerts
|

Production Optimization through Voidage Replacement using Triggers for Production Rate

Abstract: Voidage replacement is a key element in displacement processes, not only for keeping the reservoir pressure at its initial level but also in mitigating surface subsidence in certain fields. Despite its simple definition, it is a complicated process in reservoir management because of uncertainities involved and lack of all required measurements due to economical or technical restrictions. Thus, every single decision parameter and their relative significance in voidage replacement process is important for robust… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…To define different CO 2 EGR scenarios, the concept of voidage replacement was introduced. 53,54 The voidage replacement ratio (VRR) is defined as 55 :…”
Section: Optimisation Of Co 2 -Egr Operationmentioning
confidence: 99%
See 1 more Smart Citation
“…To define different CO 2 EGR scenarios, the concept of voidage replacement was introduced. 53,54 The voidage replacement ratio (VRR) is defined as 55 :…”
Section: Optimisation Of Co 2 -Egr Operationmentioning
confidence: 99%
“…To define different CO 2 EGR scenarios, the concept of voidage replacement was introduced 53,54 . The voidage replacement ratio (VRR) is defined as 55 : VRRbadbreak=VinjVProdgoodbreak=RinjRprod\begin{equation} \mathrm{VRR}=\frac{{V}_{\mathrm{inj}}}{{V}_{\mathrm{Prod}}}=\frac{{R}_{\mathrm{inj}}}{{R}_{\mathrm{prod}}} \end{equation}where Vinj${V_{{\rm{inj}}}}$ is the volume of the fluid injected, VProd${V_{{\rm{Prod}}}}$ is the volume of the hydrocarbon produced, Rinj${R_{{\rm{inj}}}}$ is the injection rate and Rprod${R_{{\rm{prod}}}}$ is the production rate. If the VRR is equal to or greater than 1, the pressure in the reservoir is maintained or increased.…”
Section: Numerical Modellingmentioning
confidence: 99%