Day 2 Tue, November 11, 2014 2014
DOI: 10.2118/171779-ms
|View full text |Cite
|
Sign up to set email alerts
|

Production Optimization of Maximum Reservoir Contact Well by Utilizing Acid Stimulation with Limited Entry Technique

Abstract: In recent years, a major Abu Dhabi offshore operating company has shifted towards utilizing Maximum Reservoir Contact (MRC) wells to improve oil production and long-term oil recovery. The initial MRC pilots demonstrated the importance of designing the well and completion to facilitate intervention and stimulation. Coiled tubing stimulation methods applied in these first wells were able to meet the objective by significantly improving overall oil production and water injection. However, as we move into tighter … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
references
References 2 publications
0
0
0
Order By: Relevance