Day 1 Tue, November 07, 2017 2017
DOI: 10.2118/189223-ms
|View full text |Cite
|
Sign up to set email alerts
|

Production and Cost Optimization in a Complex Onshore Operation Using Integrated Production Model

Abstract: During this low oil price era, E&P operators are challenged to reduce operating costs by evaluating their production system. Integrated production model (IPM), which combined subsurface model and surface production system, is a tool that can be utilized to evaluate the existing production system and to arrange the upcoming production strategy. This paper focuses on Kaji-Semoga oil field which consists of three field processing stations, three compressor stations, 130 ESP and 63 gas lift (GL) wells. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Previous research in this area promised to further revolutionize key aspects of oil production applications including well monitoring and control, reservoir management, production optimization, , artificial lift, flow assurance, , and predictive maintenance. In general, this research area focuses on the utilization of machine learning in order to understand the status of equipment so as to facilitate predictive maintenance and to avoid operation downtime.…”
Section: Introductionmentioning
confidence: 99%
“…Previous research in this area promised to further revolutionize key aspects of oil production applications including well monitoring and control, reservoir management, production optimization, , artificial lift, flow assurance, , and predictive maintenance. In general, this research area focuses on the utilization of machine learning in order to understand the status of equipment so as to facilitate predictive maintenance and to avoid operation downtime.…”
Section: Introductionmentioning
confidence: 99%