Procedure for scheduling power generation at HPP in the second quarter with allowance for run-off-forming and climatic factors

Abstract: A procedure is developed for analysis of scheduled generation at HPP using run-off-forming data relative to water reserves.To organize reliable fuel and energy supply, it is necessary to schedule power generation at hydroelectric plants (HPP) with maximum lead time [9]. The procedures currently used for the scheduling of power generation at HPP are based on data relative to the forecasting of water flow in river basins, or on scheduled generation normally adopted as the average-multiyear value. These forecasts… Show more