2017
DOI: 10.17580/nfm.2017.01.08
|View full text |Cite
|
Sign up to set email alerts
|

Problems of analysis of thermalphysic processes in a reaction zone of electrothermal reactor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
3
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…where J = the number of the potential sources for the heat recuperation, E 1 j = all the energy that can be reused from the jth source, E 2 j = energy of the jth source that is used at the current time; C j = the unit cost of the energy, and C j d = the cost of additional solutions on construction optimization of the jth source. Due to constraint fulfillment in CETS, presented in the form of inequalities, when optimizing efficiency criterion (1), high-quality implementation of chemical power engineering processes is achieved by reducing the return part, which ensures resource savings [15,16].…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…where J = the number of the potential sources for the heat recuperation, E 1 j = all the energy that can be reused from the jth source, E 2 j = energy of the jth source that is used at the current time; C j = the unit cost of the energy, and C j d = the cost of additional solutions on construction optimization of the jth source. Due to constraint fulfillment in CETS, presented in the form of inequalities, when optimizing efficiency criterion (1), high-quality implementation of chemical power engineering processes is achieved by reducing the return part, which ensures resource savings [15,16].…”
Section: Methodsmentioning
confidence: 99%
“…Resource consumption optimization is an important condition for ensuring the economic efficiency of various technological systems [17][18][19][20][21]. The optimization of energy and resource consumption in individual CETS units for the production of phosphorus is the subject of works by a number of authors, e.g., [5,15,16]. However, the solution for the criterion (2) minimization based on the application of classical mathematical approaches to the entire CETS, but not its individual parts, leads to the problem of inconsistency in the description and limitations of the models of individual units.…”
Section: Methodsmentioning
confidence: 99%
“…imulation of processes in electrothermal ore-smelting reactors for manufacturing non-ferrous metal alloys allows one to determine conditions for optimal functioning and cost reduction per unit of output [1][2][3][4][5][6][7][8]. There are not so many works that take the peculiarities of the physics of processes occurring in the reactors of this type into account [9][10][11][12].…”
mentioning
confidence: 99%