2015
DOI: 10.1088/1757-899x/78/1/012027
|View full text |Cite
|
Sign up to set email alerts
|

Probabilistic Life Cycle Cost Model for Repairable System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…Cost estimation through probability analysis has been performed assuming degradation of asphalt and concrete for 100 years but it only provides repairing cost estimation not based on the quantitative modeling but on the assumed simulation (Salem et al 2003;Swei et al 2013;Chan et al 2008). In the previous models, the probability techniques mainly dealt with the cost connections like investment, running, maintenance, fault, and dismantle without deterioration evaluation/prediction based on probability approach (Nasir et al 2015;Bian et al 2014). Many complicated numerical techniques such as artificial neural network (Nasir et al 2015;Bian et al 2014), fuzzy logic systems, and adaptive network-based fuzzy inference system are implemented for LCCA but repairing cost is usually determined through not probability method but deterministic method (Flintsch and Chen 2004;Barringer and Weber 1997;Rahman and Vanier 2004).…”
Section: Introductionmentioning
confidence: 99%
“…Cost estimation through probability analysis has been performed assuming degradation of asphalt and concrete for 100 years but it only provides repairing cost estimation not based on the quantitative modeling but on the assumed simulation (Salem et al 2003;Swei et al 2013;Chan et al 2008). In the previous models, the probability techniques mainly dealt with the cost connections like investment, running, maintenance, fault, and dismantle without deterioration evaluation/prediction based on probability approach (Nasir et al 2015;Bian et al 2014). Many complicated numerical techniques such as artificial neural network (Nasir et al 2015;Bian et al 2014), fuzzy logic systems, and adaptive network-based fuzzy inference system are implemented for LCCA but repairing cost is usually determined through not probability method but deterministic method (Flintsch and Chen 2004;Barringer and Weber 1997;Rahman and Vanier 2004).…”
Section: Introductionmentioning
confidence: 99%