Probabilistic Evaluation of Substation Criticality Based on Static and Dynamic System Performances

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 20 publications
(15 citation statements)
references
References 21 publications
0
15
0
Order By: Relevance
“…In this stage, the constraints are represented by (2), (3), and also by the maximum power outputs of the generating units (6): (6) where and are, respectively, the lower and upper bounds of the generated power at node .…”
Section: A Static Rankingmentioning
confidence: 99%
See 2 more Smart Citations
“…In this stage, the constraints are represented by (2), (3), and also by the maximum power outputs of the generating units (6): (6) where and are, respectively, the lower and upper bounds of the generated power at node .…”
Section: A Static Rankingmentioning
confidence: 99%
“…Controlled or intentional islanding [1], algebraic network theory [2], polyhedral dynamics [3], artificial intelligence based search methods [4], and spectral graph theory [5] are among those techniques proposed to find critical equipment and vulnerability indices. Recently, a novel probabilistic-based method to incorporate substations related outages in composite system reliability evaluation was presented in [6], but with emphasis on the substation reliability.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Stability analysisoriented research is mainly based on the evaluation of the violation of the limit of power system quantities and the behavior of the generator under contingency conditions. Some methods [2][3][4][5] proposed for stability assessment in the latest literature were based on risk or probabilistic, pattern recognition, and time domain simulation (TDS) techniques. TSA is directly concerned about the large disturbance.…”
Section: Introductionmentioning
confidence: 99%
“…TSA is directly concerned about the large disturbance. A risk-based methodology was proposed in [2][3][4]. A probabilistic small-disturbance stability analysis (PSSA) method with uncertainties was proposed by Preece and Milanović [2].…”
Section: Introductionmentioning
confidence: 99%