2012 15th International IEEE Conference on Intelligent Transportation Systems 2012
DOI: 10.1109/itsc.2012.6338764
|View full text |Cite
|
Sign up to set email alerts
|

Probabilistic estimation of temporary lanes at road work zones

Abstract: Road work zones pose a great challenge for the environmental perception with sensors and the correct modelling of the scenery. Especially the recognition of the valid lane is of great interest for driver assistance systems. At road work zones temporary lanes invalidate the original lanes while the latter are still present on the road. All lines are detected with a greyscale video camera. In this paper we present an approach which generates different hypotheses for the lanes originated from the two different ty… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…Graf et al ( 20 ) investigate a more limited example in which temporary lane markers assist drivers through a work zone. This method monitors the lanes even if both temporary and original lane markers are present.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Graf et al ( 20 ) investigate a more limited example in which temporary lane markers assist drivers through a work zone. This method monitors the lanes even if both temporary and original lane markers are present.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Point-based event detection can be summarized as the process of confirming the existence of the event, which is also a necessary step in the route-based event detection. Figure 1b shows the process of route-based event detection which involves the ''event initialization'' (event estimation) and ''event cancellation'' (11). The location information in the detection result is a set of points instead of one point of interest.…”
Section: Existing Workmentioning
confidence: 99%