2018 5th International Conference on Control, Decision and Information Technologies (CoDIT) 2018
DOI: 10.1109/codit.2018.8394832
|View full text |Cite
|
Sign up to set email alerts
|

Proactive Maintenance of Railway Switches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(9 citation statements)
references
References 3 publications
0
8
0
Order By: Relevance
“…Furthermore, the implementation of the platform enables the provision of maintenance services based on the data collected from sensors and CPS. As other implementations of the same reference architecture, 27,28 the objective is to focus on proactive maintenance services to improve asset availability at lower costs through continuous process and equipment monitoring and data analysis. AOI clustering and time series forecasting are being used to determine RCA and RUL.…”
Section: Resultsmentioning
confidence: 99%
“…Furthermore, the implementation of the platform enables the provision of maintenance services based on the data collected from sensors and CPS. As other implementations of the same reference architecture, 27,28 the objective is to focus on proactive maintenance services to improve asset availability at lower costs through continuous process and equipment monitoring and data analysis. AOI clustering and time series forecasting are being used to determine RCA and RUL.…”
Section: Resultsmentioning
confidence: 99%
“…The consequence of this condition is a change in the state of the diverted track radii and the position of the geometric center point SG of the double slip turnouts. Hegedűs et al [6] rightly stated that turnouts operate under difficult conditions and that their reliability requirements are high due to safety and economic factors. Thus, as Aniołek and Herian [7] emphasize, the problem of the durability of turnouts and rails remains open to technological research to determine their structural relationships and mechanical characteristics.…”
Section: Name Proper Condition Existing Condition Differencementioning
confidence: 99%
“…Once implemented, their maintenance depends on the data collected regarding their condition and decisions on appropriate corrective actions. The more regular the data collection and decision cycle are, the greater trust the operator will have in an efficient and correct service [ 6 ]. Proactive maintenance entails carrying out maintenance activities that are based on operating hours or the number of hours of operation instead of planning maintenance only when really needed.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…While aiming at the increase of safety with continuously decreasing maintenance staff and simplification of their work in railway stations, the notion of predictive diagnostics (dynamic diagnostics) and operational diagnostics should be more widely dealt with [ 57 , 58 , 59 ]. This paper presents the concept of computer diagnostics of a switch drive [ 60 ].…”
Section: Introductionmentioning
confidence: 99%