Priority-based heuristics for the multi-skill resource constrained project scheduling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
54
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 66 publications
(54 citation statements)
references
References 17 publications
0
54
0
Order By: Relevance
“…From Almeida et al. (), it is possible to observe that the average time to compute these upper bounds was less than one second of CPU time.…”
Section: Computational Experimentsmentioning
confidence: 99%
See 2 more Smart Citations
“…From Almeida et al. (), it is possible to observe that the average time to compute these upper bounds was less than one second of CPU time.…”
Section: Computational Experimentsmentioning
confidence: 99%
“…In this work, we consider the best upper bound provided by the heuristic developed in Almeida et al. ().…”
Section: Problem Definition Notation and Propertiesmentioning
confidence: 99%
See 1 more Smart Citation
“…This class represents a recent extension of the project scheduling problem: the first contribution to the study is represented by Néron (2002). Other examples of this class of problems and proposed heuristics to solve them can be found in Almeida et al (2016).…”
Section: Proceedings Of the 20th World Congressmentioning
confidence: 99%
“…The serial method is activity-based, while the parallel method is time-based. Almeida et al 8 put forward a heuristic framework to solve the multi-skill RCPSP based on parallel scheduling scheme. Maghsoudlou et al 9 extended RCPSP taking into account multi-skill and multi-mode that integrated with discrete time-costquality trade-off.…”
Section: Literature Reviewmentioning
confidence: 99%