2018
DOI: 10.1016/j.asoc.2018.04.021
|View full text |Cite
|
Sign up to set email alerts
|

Priority-based and conflict-avoidance heuristics for multi-satellite scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 47 publications
(15 citation statements)
references
References 38 publications
0
12
0
Order By: Relevance
“…Hence, in the case of joint probabilities, our scheduling model can be reformulated as: ( 27)-( 32), ( 5)- (10). Note that there are random variablesλ ik in the model, and thus the model cannot be solved directly.…”
Section: Branch-and-boundmentioning
confidence: 99%
See 1 more Smart Citation
“…Hence, in the case of joint probabilities, our scheduling model can be reformulated as: ( 27)-( 32), ( 5)- (10). Note that there are random variablesλ ik in the model, and thus the model cannot be solved directly.…”
Section: Branch-and-boundmentioning
confidence: 99%
“…Considering task merging for EOS observation, Wu et al [41] proposed a simulated annealing algorithm based on the adaptive neighborhood operators. Moreover, metaheuristics for EOS scheduling also include tabu search algorithms [20,26,34,35,46], genetic algorithms [23,31,39,42], ant colony algorithms [10,24,40,45], local search algorithms [21,22] and simulated annealing algorithms [18,20].…”
Section: Introductionmentioning
confidence: 99%
“…problems. Practices show that heuristic rules can obtain a rapid initial schedule and significantly speed up the solving procedure of satellite scheduling [34][35][36]. In this section, a priority-based construction heuristic is chosen to perform as initial algorithms for integrated AEOS scheduling, as shown in Algorithm 1.…”
Section: Construction Heuristicmentioning
confidence: 99%
“…High attention has been paid on the imaging task scheduling with multiple satellites relatively recently [3,25,[27][28][29][30][31][32][33][34][35]. The review of past studies on scheduling of agile satellite imaging led the authors to identify the opportunity primarily for improving the quality of a schedule solution.…”
Section: Introductionmentioning
confidence: 99%