2019
DOI: 10.1061/(asce)cf.1943-5509.0001340
|View full text |Cite
|
Sign up to set email alerts
|

Prioritizing Rubble-Mound Breakwater’s Repairs Using a Multicriteria Approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 12 publications
0
0
0
Order By: Relevance
“…The information from all breakwaters downgraded during lifetime and the guidelines of Life Cycle Management (LCM) given by PIANC (2008) can be used as a framework to prioritize breakwater repairs (Marujo et al, 2019). In addition to the natural degradation of infrastructures in a breakwater's lifetime, CC and SLR are increasing the design wave loads on existing breakwaters and damages are likely to increase.…”
Section: Upgrading Repair and Rehabilitation Of Mound Breakwatersmentioning
confidence: 99%
“…The information from all breakwaters downgraded during lifetime and the guidelines of Life Cycle Management (LCM) given by PIANC (2008) can be used as a framework to prioritize breakwater repairs (Marujo et al, 2019). In addition to the natural degradation of infrastructures in a breakwater's lifetime, CC and SLR are increasing the design wave loads on existing breakwaters and damages are likely to increase.…”
Section: Upgrading Repair and Rehabilitation Of Mound Breakwatersmentioning
confidence: 99%