Our system is currently under heavy load due to increased usage. We're actively working on upgrades to improve performance. Thank you for your patience.
2018
DOI: 10.1051/e3sconf/20183303070
|View full text |Cite
|
Sign up to set email alerts
|

Principles and methods for ensuring safe operation of high-rise buildings

Abstract: The purpose of monitoring the technical condition of high-rise buildings is to prevent possible negative situations leading to significant socio-economic losses by timely warning of the emergence of such situations. To achieve this goal, it is necessary to solve the following main tasks, such as: identifying the time and place of origin and development of negative processes that lead to the emergence of an emergency situation; analysis of the possible development of the situation in time; development of manage… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Organizational and technological stages of the forensic construction and technical expert examination have been investigated [7,8]. The organizational of construction as a complex of works in the implementation of high-rise buildings were studied [9][10][11][12]. The innovative and technical solutions for environmental sustainability in the construction, which were described in this article were also considered [13,14].…”
Section: Resultsmentioning
confidence: 99%
“…Organizational and technological stages of the forensic construction and technical expert examination have been investigated [7,8]. The organizational of construction as a complex of works in the implementation of high-rise buildings were studied [9][10][11][12]. The innovative and technical solutions for environmental sustainability in the construction, which were described in this article were also considered [13,14].…”
Section: Resultsmentioning
confidence: 99%
“…Based on the calculations made, the hypothesis that there is agreement of experts when ranking the factors is accepted as true, to research based on the organizational-technological methodology, mechanization and automation of work in the construction of high-rise buildings [9][10][11][12][13][14][15][16][17][18][19][20].…”
Section: Resultsmentioning
confidence: 99%
“…The quality of organizational and technological solutions in construction, innovative vectors of accelerating the development of construction organization, definitions of the reengineering from Russian and foreign sources, the nodal method in the construction also a base for the research [7][8][9][10]. The features of the organization and technology of production and its models at these facilities of high-rise objects have been determined in the studies [11,12]. In our research model arces are determined by special symbols, аij and bij.…”
Section: Methodsmentioning
confidence: 99%