Our system is currently under heavy load due to increased usage. We're actively working on upgrades to improve performance. Thank you for your patience.
2006 38th North American Power Symposium 2006
DOI: 10.1109/naps.2006.360125
|View full text |Cite
|
Sign up to set email alerts
|

Preventive Maintenance Using Continuous-Time Semi-Markov Processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2007
2007
2022
2022

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 19 publications
(16 citation statements)
references
References 6 publications
0
16
0
Order By: Relevance
“…In addition to a minimum volume ellipsoid , define a family of ellipsoids , where each is tight to along a direction specified by a unitary vector . 5 The shape matrix of can be obtained through the solution of the following optimization program (21) where is the set of vertices that enclose , and is the maximum length of the semi-axis in the direction [19]. The objective function is the projection of the ellipsoid onto the direction.…”
Section: Capturing Uncertainty With a Family Of Tight Upper-boundimentioning
confidence: 99%
See 2 more Smart Citations
“…In addition to a minimum volume ellipsoid , define a family of ellipsoids , where each is tight to along a direction specified by a unitary vector . 5 The shape matrix of can be obtained through the solution of the following optimization program (21) where is the set of vertices that enclose , and is the maximum length of the semi-axis in the direction [19]. The objective function is the projection of the ellipsoid onto the direction.…”
Section: Capturing Uncertainty With a Family Of Tight Upper-boundimentioning
confidence: 99%
“…In addition to the minimum volume upper-bounding ellipsoid , define a family of ellipsoids , where each is tight to along a direction specified by a unitary vector . Note that the can be constructed by solving an optimization program similar to the one in (21). Finally, for all , , and appropriate values of , we obtain ellipsoidal upper bounds on , , , and .…”
Section: Capturing Uncertainty With a Family Of Tight Upper-boundimentioning
confidence: 99%
See 1 more Smart Citation
“…In order to maintain the high-reliability level of the machine during the operational phase, it is necessary to carry out periodic preventive maintenance (Tomasevicz, 2006). Over the course of the analysis, it was determined that the company is carrying out scheduled repairs with a periodicity set by the manufacturer of the equipment, which does not take into consideration all the factors that are encountered during the exploitation of the equipment.…”
Section: Maintenance Schedulingmentioning
confidence: 99%
“…The procedures and steps for using Semi-Markov Processes to model a practical system is shown in Figure 1. The detail description of Semi-Markov processes is given in our prior researches [11].…”
Section: A General Semi-markov Processesmentioning
confidence: 99%