2010
DOI: 10.1080/00207720903230765
|View full text |Cite
|
Sign up to set email alerts
|

Preventive maintenance scheduling for a multi-component system with non-negligible replacement time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 34 publications
(11 citation statements)
references
References 14 publications
0
10
0
Order By: Relevance
“…However, for economic, logistic and technical reasons, the periodic aspect of PR actions has to be properly managed. In fact, many manufacturers and researchers tried to group PM actions for economic reasons . As a result, the periodicity of the PR types should be a multiple of the PR periodicity T (Figure ).…”
Section: Implemented Maintenance Policymentioning
confidence: 99%
“…However, for economic, logistic and technical reasons, the periodic aspect of PR actions has to be properly managed. In fact, many manufacturers and researchers tried to group PM actions for economic reasons . As a result, the periodicity of the PR types should be a multiple of the PR periodicity T (Figure ).…”
Section: Implemented Maintenance Policymentioning
confidence: 99%
“…According to the well-known formulation in maintenance planning, the expected total cost per unit time is given by [15] …”
Section: Cost Modelmentioning
confidence: 99%
“…In the past decades, maintenance policies for repairable systems have been extensively studied, e.g. Ben-Daya, Duffuaa, and Raouf (2000), Laggoune, Chateauneuf, and Aissani (2010), Sheu and Chang (2010), Fan, Hu, Chen, andZhou (2011), andLiao (2013). Several excellent reviews are provided by Valdez-Flores and Feldman (1989), Wang (2002), and Jardine, Lin, and Banjevic (2006).…”
Section: Introductionmentioning
confidence: 98%