Prevention of NERC C3 category outages in Idaho power's network: Risk based methodology and practical application

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 15 publications
0
5
0
Order By: Relevance
“…However, widespread interruption and cascading remain possible, especially if these contingencies are accompanied by other system vulnerabilities that can result in complex contingencies. Identification and analysis of complex contingencies in Idaho Power system became important issues that have been investigated in recent work in both planning and operation environments [3]- [5], Reference [4] presents a risk-based approach for contingency analysis implemented at Idaho Power Company.…”
Section: Approach To Cascading 1) Aims Of Studymentioning
confidence: 99%
See 2 more Smart Citations
“…However, widespread interruption and cascading remain possible, especially if these contingencies are accompanied by other system vulnerabilities that can result in complex contingencies. Identification and analysis of complex contingencies in Idaho Power system became important issues that have been investigated in recent work in both planning and operation environments [3]- [5], Reference [4] presents a risk-based approach for contingency analysis implemented at Idaho Power Company.…”
Section: Approach To Cascading 1) Aims Of Studymentioning
confidence: 99%
“…Idaho Power, since the major blackout event on July 2 nd , 1996 that originated in its service territory, continuously evaluates and study its system to ensure that its performance meets not only North Electric Reliability Corporation (NERC) standards and WECC Reliability Criteria [l]- [2] but also going beyond those requirements [3]- [5]. Idaho Power system is a portion of the Bulk Electric System (BES) in the Western Interconnection.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Developed methodologies and tools to assess system performance have served the industry very well in the past [35]- [37]. However, it is becoming more apparent that reliable operation of the power system is highly dependent on the reliability of the associated cyber system, and failure in the cyber system can result in undesirable consequences.…”
Section: A Bulk Industry Standardsmentioning
confidence: 99%
“…Up to now, many different methods using approaches based on risk evaluation have been applied [6, 816], but they have mainly assessed reliability on the basis of one indicator. Either on the basis of overload caused by an outage of an element [10], on the basis of voltage violations and angular stability [16], or on the basis of load outage [8, 13, 14, 15]. The methodology presented in [9] combines various problems in the network into one indicator.…”
Section: Introductionmentioning
confidence: 99%