2019
DOI: 10.1109/access.2019.2944848
|View full text |Cite
|
Sign up to set email alerts
|

Preventing Cascading Failure Through Fuzzy Co-Operative Control Mechanism Using V2G

Abstract: The previously proposed algorithms for preventing cascading failures, which lead to a blackout event, involve specific load shedding schemes, which introduce incurring losses in the power system network. In this paper, a cooperative control based algorithm using a vehicle to grid (V2G) technology based on a fuzzy logic approach is proposed to prevent cascading failures without loss incurrence. The algorithm is implemented on a standard IEEE-30 bus system, and it uses mathematical combinations heuristically to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

2
7

Authors

Journals

citations
Cited by 24 publications
(6 citation statements)
references
References 68 publications
0
6
0
Order By: Relevance
“…Any state's electrical grids are of highest importance. The capability of the FACTS devices to maintain system stability is also researched in [38], [39], [40], [41], [42], [43], [44], and [45]. Before the invention of power electronics switches, these problems were dealt with by connecting reactors, capacitors, or synchronous generators using mechanical switches.…”
Section: B Incorporation Of Facts Devicesmentioning
confidence: 99%
“…Any state's electrical grids are of highest importance. The capability of the FACTS devices to maintain system stability is also researched in [38], [39], [40], [41], [42], [43], [44], and [45]. Before the invention of power electronics switches, these problems were dealt with by connecting reactors, capacitors, or synchronous generators using mechanical switches.…”
Section: B Incorporation Of Facts Devicesmentioning
confidence: 99%
“…In literature, various strategies for V2G aggregators have been previously defined by the industrial and academic researchers all over the world [55]. The operation of every proposed framework mainly depends on the controlling strategy.…”
Section: Basic Architecture Of the Proposed V2g Aggregation System 12...mentioning
confidence: 99%
“…The average delay model in (7) represents the occurrence of multiple intervals TPFs upto two intervals, i.e., first interval (λ 1 ) and second interval (λ 2 ).…”
Section: Probabilistic Modeling Of Upfc Incorporated Smart Network Transmissionmentioning
confidence: 99%
“…Due to this reason, structure vulnerabilities and uncertainties occurred in these multiple interconnected (MIRIPGs) infrastructures [5]. For example, considering the phenomena of cascading failures, which is also known as ripple effects, takes place in RIPGs, triggers an unpredictable form of chain reactions [6] [7] [8]. In 2011, the blackouts in Southern California and Southwest Arizona and the unprecedented blackout in 2012 in India were the most notable examples [9].…”
Section: Introductionmentioning
confidence: 99%