2010
DOI: 10.1103/physrevstab.13.042801
|View full text |Cite
|
Sign up to set email alerts
|

Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

Abstract: ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
5
3

Relationship

4
4

Authors

Journals

citations
Cited by 27 publications
(19 citation statements)
references
References 6 publications
0
19
0
Order By: Relevance
“…In 2008, as part of the ATF2 project [18], the beamline was upgraded and the extraction line was replaced with one incorporating an energy-scaled version of the compact beam focusing system designed for linear colliders [19]. The goals of the ATF2 Collaboration [20] are to produce a 37 nm vertical beam spot size at the final focus point and to stabilize the vertical beam position to the nanometer level.…”
Section: Methodsmentioning
confidence: 99%
“…In 2008, as part of the ATF2 project [18], the beamline was upgraded and the extraction line was replaced with one incorporating an energy-scaled version of the compact beam focusing system designed for linear colliders [19]. The goals of the ATF2 Collaboration [20] are to produce a 37 nm vertical beam spot size at the final focus point and to stabilize the vertical beam position to the nanometer level.…”
Section: Methodsmentioning
confidence: 99%
“…This has the advantage that variations in the test tone amplitude and phase are canceled as can be seen from Eq. (7).…”
Section: Mover Systemmentioning
confidence: 99%
“…The rf signal processing electronics parameters. ðt DDC;d Þ A r ðt DDC;r Þ sin½ d ðt DDC;r Þ À r ðt DDC;r Þ;(7) …”
mentioning
confidence: 99%
“…The ATF2 commissioning and first results have been described elsewhere. In particular, the paper [25] described the status of ATF2 as of 2010 when most of the beam hardware been commissioned and regular operation with the beam started.…”
Section: Atf2 Commissioning and Recent Resultsmentioning
confidence: 99%