Preparing a Gas Field Development Plan : Tangga Barat Cluster Gas Project

Abstract: Field development planning is one of the core business processes in the upstream oil and gas industry. Before a discovered field can be developed and its hydrocarbon produced, proper evaluation and planning of the subsurface reservoirs and surface facilities are necessary to ensure that the field development plan is not only economical to undertake, but also flexible enough to cater for any deviation from the original plan during implementation as a result of inherent uncertainties in the reservoirs over the p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…It is designed for a peak capacity of 440 MMscf/d of raw gas with an initial blended CO 2 level of 37 mole% (Tangga Barat CO 2 content) prior to CO 2 removal. The raw gas is then processed, pretreated, reducing the CO 2 content to 8 mole% to meet the specifications of the downstream sales gas process requirement from the PETRONAS gas processing plant at Kertih Terengganu [32].…”
Section: Gas Field Modelmentioning
confidence: 99%
“…It is designed for a peak capacity of 440 MMscf/d of raw gas with an initial blended CO 2 level of 37 mole% (Tangga Barat CO 2 content) prior to CO 2 removal. The raw gas is then processed, pretreated, reducing the CO 2 content to 8 mole% to meet the specifications of the downstream sales gas process requirement from the PETRONAS gas processing plant at Kertih Terengganu [32].…”
Section: Gas Field Modelmentioning
confidence: 99%