2012
DOI: 10.2172/1050299
|View full text |Cite
|
Sign up to set email alerts
|

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 18 publications
(13 reference statements)
0
1
0
Order By: Relevance
“…One alternative to minimize TDG supersaturation is to install deflectors on the spillway face to redirect the regular plunging flow to surface jets tangential to the free surface (Politano et al, 2016). This structure was used or is being evaluated in others hydropower plants (HPP) such as Hells Canyon Dam (Politano et al, 2016); McNary Dam (Politano et al, 2015;Wang et al, 2018); Wanapum Dam (Hadjerioua et al, 2014); Brownlee Dam (Myers & Parkinson, 2003) and Yacyretá HPP (Bacchiega & Fattor, 2014).…”
Section: Introductionmentioning
confidence: 99%
“…One alternative to minimize TDG supersaturation is to install deflectors on the spillway face to redirect the regular plunging flow to surface jets tangential to the free surface (Politano et al, 2016). This structure was used or is being evaluated in others hydropower plants (HPP) such as Hells Canyon Dam (Politano et al, 2016); McNary Dam (Politano et al, 2015;Wang et al, 2018); Wanapum Dam (Hadjerioua et al, 2014); Brownlee Dam (Myers & Parkinson, 2003) and Yacyretá HPP (Bacchiega & Fattor, 2014).…”
Section: Introductionmentioning
confidence: 99%