2005
DOI: 10.2118/87842-jpt
|View full text |Cite
|
Sign up to set email alerts
|

Prediction and Evaluation of Sanding and Casing Deformation in a GOM-Shelf Well

Abstract: 75Sand production is an important well-completion issue affecting well economics and, possibly, casing stability. This study compares predictions of sanding and casing deformation for a well in the U.S. Gulf of Mexico (GOM) shelf prepared before completion of the well with the results of a post-sanding event for this well. The sanding event was predicted adequately considering the uncertainty of the data entered into the model. The casing deformation monitored by the post-sanding survey also was consistent wit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2006
2006
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 2 publications
0
3
0
Order By: Relevance
“…The risk of casing deformation was felt to be low due to the low volume of sand predicted to be produced. It has been noted by others however, that casing deformation may occur whenever sand is produced 6,7 .…”
Section: Evaluation Of Cavity-like Completion Techniquementioning
confidence: 99%
“…The risk of casing deformation was felt to be low due to the low volume of sand predicted to be produced. It has been noted by others however, that casing deformation may occur whenever sand is produced 6,7 .…”
Section: Evaluation Of Cavity-like Completion Techniquementioning
confidence: 99%
“…2). This plot is useful for sanding evaluation 3,4 . In this plot the flowing well pressure (BHFP) is plotted versus reservoir pressure and regions of no flow, sand production and acceptable sand production are defined.…”
Section: An Empirical Sand Production Criterionmentioning
confidence: 99%
“…A third aspect is to be able to evaluate whether a cased/perforated completion can be used initially, and to defer a sand control option until later, with cost and flow rate and environmental advantages. 1 In summary, there is often a substantial cost benefit -both for capital and operating expenditure -if sand management can be deployed successfully.…”
Section: Introductionmentioning
confidence: 99%