2020
DOI: 10.1016/j.jairtraman.2020.101848
|View full text |Cite
|
Sign up to set email alerts
|

Predicting the impact of Trans Java Toll Roads on demand for intercity air travel in Indonesia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 22 publications
0
3
0
Order By: Relevance
“…1 , is used to analyze the correlation among latent variables. In estimating the coefficients, this study applied the maximum likelihood, which is commonly used in studies related to the TPB [ [36] , [37] , [38] ]. SEM and CFA were employed using the IBM SPSS AMOS 26 [ 39 ].…”
Section: Methodsmentioning
confidence: 99%
“…1 , is used to analyze the correlation among latent variables. In estimating the coefficients, this study applied the maximum likelihood, which is commonly used in studies related to the TPB [ [36] , [37] , [38] ]. SEM and CFA were employed using the IBM SPSS AMOS 26 [ 39 ].…”
Section: Methodsmentioning
confidence: 99%
“…Orthogonal design is considered to be efficient only in cases when the prior parameters are unknown, as discussed by Bliemer et al (2009) . Previous studies also used this method to design the experiments ( Han and Timmermans, 2022 ; Irawan et al, 2020b ; Qin et al, 2017 ). However, two generated scenarios from orthogonal design are improper for the field condition: the availability of separated bicycle lanes exists in uncongested traffic.…”
Section: Methodsmentioning
confidence: 99%
“…Pembangunan jalan tol di Indonesia dimulai sejak tahun 2014 dengan menjadikan Tol Trans Jawa sebagai perioritas utama [17], dan penerapan skema KPBU pada proyek jalan tol di Indonesia diharapkan tidak hanya mengatasi permasalahan finansial melainkan juga dapat berperan dalam mewujudkan pembangunan berkelanjutan [18]. Akan tetapi, skema kerjasama ini memiliki banyak risiko misalnya risiko finansial, risiko konstruksi, risiko operasional, risiko sosial, risiko lingkungan dan lain sebagainya [19], [20].…”
Section: Pendahuluanunclassified