1994
DOI: 10.1016/0148-9062(94)90004-3
|View full text |Cite
|
Sign up to set email alerts
|

Predicted and measured performance of the 62 m span Norwegian olympic ice Hockey Cavern at Gjøvik

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
0

Year Published

1996
1996
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 50 publications
(16 citation statements)
references
References 1 publication
0
16
0
Order By: Relevance
“…The evaluation of the proposed mined openings drew upon work from Bieniawski [1976], Barton et al [1974;1994], Hoek [1979] and Hoek and Brown [1980]. These papers present analytical formulas and empirical methods to evaluate the stability of underground openings.…”
Section: Room Size and Stabilitymentioning
confidence: 99%
See 4 more Smart Citations
“…The evaluation of the proposed mined openings drew upon work from Bieniawski [1976], Barton et al [1974;1994], Hoek [1979] and Hoek and Brown [1980]. These papers present analytical formulas and empirical methods to evaluate the stability of underground openings.…”
Section: Room Size and Stabilitymentioning
confidence: 99%
“…Barton [1976] describes successful application of the Q -system in the design of a powerhouse structure. Barton et al [1994] discusses the application of the Q -system to the design and construction of an underground ice hockey stadium in Norway. Barton et al [1974] also developed empirical relationships between rock quality, Q, and roof and wall support pressures.…”
Section: Room Size and Stabilitymentioning
confidence: 99%
See 3 more Smart Citations